- purpose
This procedure identifies and establishes the steps required to ensure customer satisfaction with the product, promotes contact with everyone involved to ensure that the required steps are completed on time, and guides resources to prevent defects, reduce costs, continuously improve, and provide quality products at the lowest cost in a timely manner to satisfy customers.
- Scope of application
This procedure applies to the process development of all products required for the production and/or service of the company.
- Duties and responsibilities
3.1 technology department is the centralized management unit of this procedure, responsible for the establishment of project team and the completion of task allocation.
3.2 all departments shall cooperate with the implementation.
- Work procedures
4.0 process input: customer product requirements, contract/development agreement;Similar product development information
4.1 development preparation
4.1 the general
APQP process is generally divided into: planning and determining the project; Sample development; Process design and development (including review and validation); Product and process validation; Feedback, evaluation and corrective action. The company has no product design and development activities.
- The basic principles of APQP
- A) the purpose is to fully meet customer requirements and expectations.
- Optimize resource allocation to produce quality products that satisfy customers at the lowest cost.
- Promote early identification and prevention to reduce deterioration and avoid late or late changes.
- A) logical thinking: an analytical method that emphasizes the input and output of the process.
- Synchronization technology: shorten the implementation cycle, close interface relationship, and emphasize efficiency.
- Multi-participation: including internal functional representatives and external customer and supplier representatives planning together.
- Application of error – proofing technology, FMEA, SPC, etc.
4.4 project approval
The sales department, by collecting market information, customer requirements or market survey, on the basis of analysis of sufficient data, based on the company’s business plan and business objectives, puts forward the “project development application form”, which will be reviewed by technical, production, quality control and other departments and reported to the general manager for approval.
4.5 basic process of APQP
4.5.1 plan and determine the project stage:
4.5.1.1 constitute a project team: after the approval of the project development application form, the general manager shall determine the project team leader, organize and set up a project team with representatives of technology, sales, quality control, finance and production (including customers and qualified suppliers when feasible), define their respective responsibilities and urge the project team to carry out work regularly.
4.5.1.2 input data collected by project team members: input data may include customer calls, such as “market research report”, service information and invalidation of main engine plant, return report, company business plan and business objectives, product/process benchmark, previous experience, customer contract or order.
4.5.1.3 project team members shall, on the basis of understanding customers’ needs, expectations and requirements, compile (initial) product process flow chart, product initial material list, (initial) product/process special features list, etc., conduct feasibility analysis and form the feasibility analysis report.
Feasibility analysis: when the project is feasible, it can be carried on to the next stage. If it is not feasible, the technical department can change the relevant scheme or cooperate with the sales department to negotiate with customers.
4.5.1.4 preparation, review and assignment of design tasks: the project team leader shall prepare the design specification and submit an application for review, and the technical supervisor shall organize relevant personnel to conduct review to ensure sufficient and appropriate design input; The content should be complete, clear and not contradictory. After the review, the general manager approves the design specification.
4.5.1.5 plan making: the project team leader shall, according to the requirements of the project, organize the members of the project team to discuss and form the APQP work plan, which shall specify the task requirements, group indirect communication and schedule of each stage and fully consider the current work requirements. See appendix 1 for the work schedule of APQP.
4.5.1.6 members of the project team shall be responsible for organizing and carrying out skills training: the analysis techniques involved in the planning activities, such as FMEA, PPAP, SPC, MSA and development skills training, shall be carried out for the members participating in APQP.
4.5.1.7 manager support: after the project is determined, the project team leader shall fill in the written document of manager support and submit it to the manager for further support, and the design and development shall enter the next stage.
4.5.1 sample development
4.5.2.1 preparation of sample trial production plan: the technical department shall prepare the “notice of new product trial production plan” to ensure the trial production of samples as planned.
4.5.2.2 preparation of sample control plan: process design members of the project team are responsible for preparing the sample control plan. For similar products, the same control plan can be applied to the implementation process of similar products if the universality of the products has been reviewed.
4.5.2.3 the technical department is responsible for preparing the sample process procedures. The sample process specification can be made use of similar product process documents that have been reviewed.
4.5.2.4 preparation list: the technical department shall be responsible for the preparation of the order form/new product equipment/tooling/mold/fixture list, the design of new tooling according to the order form, and the preparation of the test equipment list. Technical documents shall be examined and approved according to the requirements of the administrative measures for technical documents.
4.5.2.5 material procurement: the procurement department is responsible for selecting suppliers from the prescribed suppliers and purchasing materials according to the material list and procurement control procedures.
4.5.2.6 sample trial-manufacture: the production department is responsible for organizing and the production workshop is responsible for trial-manufacture according to the requirements of “notice of trial-manufacture plan for new products”, “control plan” and “process specification”; The quality control department is responsible for testing and testing the samples according to the provisions of the control plan and the process specification, and checking and accepting the new tooling; The quality control department is responsible for process verification.
4.5.2.7 sample confirmation
- A) sample validation may be performed in one or more of the following ways:
— the company tests and tests the samples;
— samples can be submitted to customers for bench or performance testing.
- B) the technology department and the sales department are responsible for collecting customer product design confirmation (installation test) information and keeping it by the technology department.
4.5.2.8 sample technical document changes
In the sample development stage, the technical department shall change the technical documents according to the technical document management measures.
4.5.2.9 management support: after the sample trial production is completed, the project team shall submit an application, and the general manager shall organize members of relevant departments to review the work in the sample development stage. After the review is passed, the project team leader shall fill in the written documents of “group feasibility commitment” and “management support” and submit them to the manager for further support, and the design and development shall enter the next stage. If the original plan cannot be carried out, the work plan should be adjusted according to the situation.
4.5.3 process design and development:
4.5.3.1 process design input and review
The technical department is responsible for collecting the input data of this process and organizing relevant personnel to review and keep records of the input according to the requirements of the product/process quality checklist.
4.5.3.2 process design output and review
- A) preparation of process flow chart: process designers in the technical department shall prepare process flow chart and characteristic matrix table according to product drawing and product special characteristic list. The technical department is responsible for the review according to the process flow chart checklist.
- B) drawing the layout of workshop: the technical department shall draw the layout of workshop according to the principles of process flow chart framework, detection point setting requirements, optimized utilization of site space, reasonable logistics and man-machine engineering. The technical department organizes relevant departments to review the floor plan according to the workshop floor plan checklist.
- C) determination and review of process FMEA analysis and process special characteristics: members of the project team, technical department and quality control department shall prepare product and process special characteristics and process FMEA analysis table according to process flow chart and characteristic matrix table. The project team leader shall organize relevant department members to review the process FMEA and process special features according to the process FMEA checklist.
- D) preparation of pilot production control plan: project team members shall prepare the pilot production control plan. For similar products, the same control plan can be applied to similar product realization process if the commonality of products has been reviewed.
- E) preparation and review of process procedures: the technical department shall prepare the process procedures (including inspection work instruction) according to the requirements of the pilot production control plan, and propose new tooling design tasks. After the completion of the design, the approval shall be conducted in accordance with the provisions of the technical document management measures.
- F) new tooling design: the technical department is responsible for new tooling design. After the completion of the design, the approval shall be conducted in accordance with the provisions of the technical document management measures.
- G) preparation of measurement system analysis plan: members of the project team shall prepare the measurement system analysis plan in accordance with the manual of measurement system analysis. Measurement system analysis is mainly aimed at the measurement system involved in the control plan.
- H) preparation of the initial process capability study plan: the project team members shall be responsible for the preparation of the initial process capability study plan. Initial process capability studies are conducted for all production process projects of developed products.
- I) preparation of product packaging specifications: the technical department is responsible for the preparation of product packaging specifications.
4.5.3.3 process design changes
The technical department shall change the design documents according to the “technical document management measures”.
4.5.3.4 management support: after the goal of the process design and development stage is completed, the project team shall submit an application, and the general manager shall organize members of relevant departments to review the process design and development stage. After the review is passed, the project team leader shall fill in the written documents of “group feasibility commitment” and “management support” and submit them to the manager for further support, and the design and development shall enter the next stage. If the original plan cannot be carried out, the work plan should be adjusted according to the situation.
4.5.4 process validation and verification
4.5.4.1 prepare and issue pilot production plan: the production department is responsible for preparing production plan.
4.5.4.2 job preparation verification: the production workshop shall conduct job preparation verification according to the product production control procedure.
4.5.4.3 pilot production: the production workshop shall organize production according to the pilot production plan. The technical department shall cooperate with the workshop to confirm the process according to the product production control procedure; The quality controller monitors and measures the products according to the control plan. The production department shall provide corresponding records to the technical department; Technical department, production workshop to verify the process.
4.5.4.4 measurement system analysis: the quality control department carries out dual analysis of measuring tools according to the measurement system analysis plan, evaluates, records and forms “measurement system analysis report”.
4.5.4.5 initial process capability study: the workshop shall carry out the initial process capability study according to the initial process capability study plan, and prepare the “initial capacity analysis report”. In case of insufficient capacity, corrective measures shall be proposed.
4.5.4.6 package evaluation: the technical department shall evaluate the package specification and package, and provide the results to the project team.
4.5.4.7 supplier PPAP:
- A) the technical department puts forward the requirement for suppliers to submit PPAP;
- B) technical department and purchasing department shall collect supplier PPAP documents as required;
- C) the technical department shall organize relevant departments to review the supplier PPAP, and approve the batch supply of the supplier after the review is passed.
4.5.4.8 process confirmation
- A) when the customer has no PPAP requirement, the project team shall confirm the company according to the procedure after 4.5.4.11.
- B) when customers have PPAP requirements, implement customer requirements, and the purchasing department is responsible for collecting customer PPAP approval documents. The customer confirms the following method:
— customer PPAP approval;
— customer confirmation of product drawing (countersign or sign similar confirmation opinions);
— customer replacement production drawing;
— other written documents of the customer;
— the customer orders again according to the original drawing (the order contract shall prevail).
4.5.4.9 mass production control plan: after PPAP is passed, project team members shall improve on the basis of pilot production control plan and prepare mass production control plan to meet the control requirements of mass production. The project team leader organizes members of relevant departments to review.
4.5.4.10 preparation list: the technical department is responsible for the preparation of material purchase list and tooling summary table; For similar products, if the commonality of the products has been reviewed, the same list can be applied to the implementation process of similar products.
4.5.4.11 after the trial production, the project team shall submit the application for development review, and the technical department shall organize members of relevant departments to review the design and development process and fill in the record form of design and development review.
4.5.4.12 quality planning, confirmation and summary: APQP shall be confirmed and summarized before the delivery of the first batch of mass production products. Including review:
— whether the control plan is timely updated and fully configured;
— whether the process instructions are advanced, detailed, operable and immediately available;
— whether the measuring tools and test equipment are analyzed for duality, accurate and reliable;
— whether all control plans and process flow charts are followed;
— whether APQP has always received the attention and support of the company’s management and conducted a management review.
4.6 engineering change
4.6.1 internal changes
4.6.1.1 in case of parts stopping production, delivery time, price or other factors requiring replacement materials, the purchasing department shall apply to the technical department for change.
4.6.1.2 if the quality control department finds any quality variation during the inspection, and the process capability analysis confirms that the production conditions must be changed, the change application shall be submitted.
4.6.1.3 when the manufacturing conditions must be changed by introducing new equipment or new processing technology, the production department or relevant departments shall apply for the change.
4.6.1.4 in the process of production, the production department shall apply for change if there are operational improvement Suggestions.
4.6.1.5 in the process of production, inspection and sales of products by other departments, if unreasonable or improvable product design is found, each unit can fill in the “engineering change application form” to apply for change to the engineering department.
4.6.2 customer changes
When the customer requests to change, the sales department shall provide the customer change data and engineering change application form to the technical department to evaluate the feasibility of the change, and the production department shall count the inventory quantity. If the client has a specified format, use a standard format file.
4.6.3 engineering change review
4.6.3.1 external engineering change application, the technical department shall organize relevant departments or multi-functional groups to discuss the feasibility of the change. If it is not feasible, the reasons for the infeasibility shall be recorded and faxed to the customer by the sales department for reassessment.
The technical department shall work with the customer to review patented designs that affect changes in form, fit and function (including performance, and/or durability) to properly evaluate all impacts.
4.6.3.2 internal engineering change application form, after receiving the engineering change application form, the technical department supervisor shall review the product quality, environmental protection, cost, production efficiency and other factors according to the change content. If it is confirmed that it is not feasible, it shall explain the specific reasons for returning it to the application unit for processing. If no consensus is reached, the management shall rule.
The sales department is responsible for notifying and obtaining the consent of customers of any changes affecting the implementation of the products required by customers.
For proprietary designs, impacts on form, fit, function (including performance and/or durability) shall be reviewed with the customer so that all impacts are properly assessed.
4.6.3.3 the engineering change review shall be completed within 2 working weeks, if required by the customer, within the time specified by the customer.
4.6.4 formulate the change plan
After the above change requirements are verified to be feasible, the technical department supervisor shall appoint engineers to organize a multi-functional team to take comprehensive consideration of product quality, environmental protection, cost, efficiency and other factors, and formulate a change plan, which shall be consistent with customer requirements. And record in engineering change request form.
4.6.5 engineering change approval
The engineer will complete the engineering change application form for the change scheme and submit it to the head of the technical department for approval. The technical department will submit the approved engineering change application form and the change data to the business department for the customer’s approval of the change scheme.
4.6.6 implementation of engineering change
After the approval of the engineering change application form, the engineer shall fill in the engineering change notice, distribute it to the production department, technical department and other relevant units, and urge all units to implement the change according to the content requirements of the engineering change notice. The technical department is responsible for tracking the implementation of engineering changes.
4.6.7 engineering change validation
4.6.7.1 the engineer shall arrange the sample production and trial production according to the sample production requirements of this procedure, and submit the qualified samples and relevant materials to the sales department for the customer’s confirmation after the qualified samples are tested.
4.6.7.2 the product size and safety performance test after the change shall be conducted by the laboratory of the quality control department of the company or by an external laboratory entrusted by the company.
4.6.7.3 for material/component changes, the supplier or the company’s outsourced laboratory shall test and provide the corresponding test report. The test report shall be approved by the head of technical department.
4.6.7.4 the technical department is responsible for ensuring that additional verification/identification requirements, such as those for npi, are met when requested by customers.
4.6.8 summary of engineering change
After the completion of engineering changes, if the customer drawings, product specifications and functionality are affected, the technical department shall modify the corresponding control plan, FMEA, inspection specifications and other documents, and the sales department or technical department shall submit them to the customer for approval according to the PPAP procedures, and track the approval results.
4.6.9 file preservation
Change documents related to automobile products shall be retained until the product is discontinued and the after-sales service period is 1 year.
Machining equipment
Forging equipment
Delivery control program
1.Purpose
Manage product delivery process to ensure on-time delivery.
2.Scope
Applicable to product delivery management.
3. Responsibility and authority
The sales department is responsible for the management of product delivery.
4.0 working procedure
4.0 process input: delivery plan.
4.1 the sales department shall determine the mode and time of product delivery according to the requirements of the order for product delivery, prepare the “shipping plan”, issue the “shipping notice”, and inform the product name (drawing number, quantity and receiving unit) of the product.
4.2 the salesman shall take delivery of the goods at the warehouse with the shipment notice, and the warehouse administrator shall record the flow direction of the batch number products.
4.3 the warehouse distributes products according to the shipment notice, and records the batch number of products;
4.4 the quality control department shall be responsible for providing the corresponding inspection and test records according to the product batch number. If electronic records are required, the quality control department shall send an email to the receiving unit on the same day.
4.5 after checking the goods, the salesman shall go to the quality control department to get the material sheet and test report of the batch products after checking the name and quantity. Material list and test report should go together with the product.
4.6 for nearby places, the salesman will deliver the goods by car and handle the goods acceptance procedures at the customer’s office.
4.7 for the long journey, the salesman shall handle the consignment/mail, and the salesman shall maintain the delivery certificate procedures, timely track the acceptance of the customer and accept the receipt in the normal response time of the customer.
4.8 after receiving the customer receipt, the salesman shall go through relevant procedures in the financial department in time.
4.9 the salesman shall track the acceptance and use of the customer, solve the problems raised by the customer in a timely manner, including the possible reasonable requirements of the customer.
4.10 in case of customer service requirements, the salesman shall provide relevant services. In case of need, the salesman shall contact relevant production or technical personnel, go to the customer for service, record the service contents and results, and fill in the on-site service record form, including the customer’s evaluation of the service.
4.11 salesman/resident representative shall track and record the delivery and acceptance of products and the use of customers in assembly. Report major nonconformities and customer complaints by phone in a timely manner.
5. Relevant documents/records
a. Shipping order
b. Certificate of delivery procedure/customer receipt
c. The delivery plan
Customer satisfaction control procedures
1.Purpose
Measure customer satisfaction to find improvement direction.
2.Applicable to the measurement of customer satisfaction.
3. Responsibility and authority
The sales department is responsible for the management of customer satisfaction.
4. Workflow
4.0 process input: customer communication and information feedback, product quality and delivery certificate/record.
4.1 measurement and analysis of customer satisfaction
4.1.1 planning of satisfaction monitoring and measurement
Conduct regular customer satisfaction surveys.
A. survey cycle: quarterly.
B. Survey objects: covering 90% of the customers, responsible personnel of relevant units of customers under investigation.
C. Survey items: quality of the company’s products; Delivery status; Service status; Production interruption of customers caused by our products; Significant customer feedback on product quality or delivery issues, additional shipping costs, customer perception, etc.
D. Investigation department: sales department.
E. Survey methods: statistical survey methods were adopted.
F. The customer satisfaction survey shall take into account both the last customer satisfaction and dissatisfaction, as well as the actual production and operation status.
4.1.2 carry out investigation
4.1.2.1 the sales department shall organize a customer satisfaction survey every quarter.Survey customers who have contracts and/or business dealings with the company in the form of a customer satisfaction questionnaire. The main means of transmission are: fax, visit, mail, E-mail and please carry.
4.1.2.2 after the “customer satisfaction survey form” is issued, the sales department shall timely track, feedback and contact customers to fill in and reply to the status.
4.1.2.3 relevant units of the company shall organize and carry out an investigation on the actual operation status of the company:
A. The sales department shall make monthly statistics and analysis of delivery, service quality level, customer notification, and customer production interruption (including sales returns).
B. Monthly statistics and analysis of product quality level by quality control department.
C. The production department organizes each workshop to calculate the process capability and process capability index of the company’s important processes every month.
D. The financial department calculates the actual operating cost, excess freight and profit of the company every month.
E. Submit the above analysis results to the sales department.
4.1.3 summarize and analyze the satisfaction
The sales department shall organize relevant departments to analyze according to the results of customer satisfaction survey and the actual operation status of the company, and form a “customer satisfaction statistical analysis report”, which shall include the trend of customer satisfaction and the main aspects of customer dissatisfaction as well as the performance indicators and improvement measures.
4.2 collect customer feedback and provide after-sales service
4.2.1 collection and feedback of feedback information
A. After receiving customer feedback, the sales department shall timely provide feedback to the quality control department and other relevant departments with the “customer feedback information processing report”.
B. The sales department keeps a record of the accounts.
4.2.2 processing of feedback information
Deliver customer feedback from sales to quality control.
The quality control department shall organize relevant departments to study and formulate corrective measures, and propose service methods, which shall be implemented by relevant departments.
C. After the completion of the service, the service implementation unit shall feed back the service results to the sales department and quality control department.
4.2.3 realization of after-sales service
4.2.3.1 telephone service method: put the summary record of the result of telephone service on the “field service record”. If necessary, if the telephone cannot be said clearly or words need to be confirmed, the report shall be sent to the customer in the form of fax. The original copy of the fax shall be attached to the field service record.
4.2.3.2 on-site service method: after the end of on-site service, the entrusted on-site service personnel shall keep the service content in the form of “on-site service record”. If it needs to be confirmed by the customer, it must be signed by the customer representative. After returning to the company, the service personnel shall submit the “on-site service record” to the sales department for preservation and feedback to the quality control department.
4.2.4 provide guaranteed return and replacement services, and relevant expenses shall be included in the quality cost.
4.3 plan improvement measures
In view of the problems in the analysis results, the sales manager shall organize the relevant departments to make improvements, and supervise and promote the improvement process. Related corrective and verification work according to “improve control procedures”.
4.4 implementation of improvement measures
4.4.1 the sales department is responsible for improving service quality and delivery quality.
4.4.2 the technical department is responsible for the improvement of application development problems and product performance problems.
4.4.3 the quality control department is responsible for the improvement of product quality problems.
4.4.4 the workshop is responsible for the improvement of the process capability of the unit.
4.4.5 the financial department is responsible for the improvement of price issues.
4.5 submit for management review
All related units shall submit investigation report, investigation analysis report and implementation of improvement measures during the management review of the company.
5. Relevant documents/records:
a.Customer satisfaction questionnaire
b.Customer satisfaction statistics
c.Customer feedback information processing report
Product quality planning and control procedures
This procedure identifies and establishes the steps required to ensure customer satisfaction with the product, promotes contact with everyone involved to ensure that the required steps are completed on time, and guides resources to prevent defects, reduce costs, continuously improve, and provide quality products at the lowest cost in a timely manner to satisfy customers.
This procedure applies to the process development of all products required for the production and/or service of the company.
3.1 technology department is the centralized management unit of this procedure, responsible for the establishment of project team and the completion of task allocation.
3.2 all departments shall cooperate with the implementation.
4.0 process input: customer product requirements, contract/development agreement;Similar product development information
4.1 development preparation
4.1 the general
APQP process is generally divided into: planning and determining the project; Sample development; Process design and development (including review and validation); Product and process validation; Feedback, evaluation and corrective action. The company has no product design and development activities.
4.4 project approval
The sales department, by collecting market information, customer requirements or market survey, on the basis of analysis of sufficient data, based on the company’s business plan and business objectives, puts forward the “project development application form”, which will be reviewed by technical, production, quality control and other departments and reported to the general manager for approval.
4.5 basic process of APQP
4.5.1 plan and determine the project stage:
4.5.1.1 constitute a project team: after the approval of the project development application form, the general manager shall determine the project team leader, organize and set up a project team with representatives of technology, sales, quality control, finance and production (including customers and qualified suppliers when feasible), define their respective responsibilities and urge the project team to carry out work regularly.
4.5.1.2 input data collected by project team members: input data may include customer calls, such as “market research report”, service information and invalidation of main engine plant, return report, company business plan and business objectives, product/process benchmark, previous experience, customer contract or order.
4.5.1.3 project team members shall, on the basis of understanding customers’ needs, expectations and requirements, compile (initial) product process flow chart, product initial material list, (initial) product/process special features list, etc., conduct feasibility analysis and form the feasibility analysis report.
Feasibility analysis: when the project is feasible, it can be carried on to the next stage. If it is not feasible, the technical department can change the relevant scheme or cooperate with the sales department to negotiate with customers.
4.5.1.4 preparation, review and assignment of design tasks: the project team leader shall prepare the design specification and submit an application for review, and the technical supervisor shall organize relevant personnel to conduct review to ensure sufficient and appropriate design input; The content should be complete, clear and not contradictory. After the review, the general manager approves the design specification.
4.5.1.5 plan making: the project team leader shall, according to the requirements of the project, organize the members of the project team to discuss and form the APQP work plan, which shall specify the task requirements, group indirect communication and schedule of each stage and fully consider the current work requirements. See appendix 1 for the work schedule of APQP.
4.5.1.6 members of the project team shall be responsible for organizing and carrying out skills training: the analysis techniques involved in the planning activities, such as FMEA, PPAP, SPC, MSA and development skills training, shall be carried out for the members participating in APQP.
4.5.1.7 manager support: after the project is determined, the project team leader shall fill in the written document of manager support and submit it to the manager for further support, and the design and development shall enter the next stage.
4.5.1 sample development
4.5.2.1 preparation of sample trial production plan: the technical department shall prepare the “notice of new product trial production plan” to ensure the trial production of samples as planned.
4.5.2.2 preparation of sample control plan: process design members of the project team are responsible for preparing the sample control plan. For similar products, the same control plan can be applied to the implementation process of similar products if the universality of the products has been reviewed.
4.5.2.3 the technical department is responsible for preparing the sample process procedures. The sample process specification can be made use of similar product process documents that have been reviewed.
4.5.2.4 preparation list: the technical department shall be responsible for the preparation of the order form/new product equipment/tooling/mold/fixture list, the design of new tooling according to the order form, and the preparation of the test equipment list. Technical documents shall be examined and approved according to the requirements of the administrative measures for technical documents.
4.5.2.5 material procurement: the procurement department is responsible for selecting suppliers from the prescribed suppliers and purchasing materials according to the material list and procurement control procedures.
4.5.2.6 sample trial-manufacture: the production department is responsible for organizing and the production workshop is responsible for trial-manufacture according to the requirements of “notice of trial-manufacture plan for new products”, “control plan” and “process specification”; The quality control department is responsible for testing and testing the samples according to the provisions of the control plan and the process specification, and checking and accepting the new tooling; The quality control department is responsible for process verification.
4.5.2.7 sample confirmation
— the company tests and tests the samples;
— samples can be submitted to customers for bench or performance testing.
4.5.2.8 sample technical document changes
In the sample development stage, the technical department shall change the technical documents according to the technical document management measures.
4.5.2.9 management support: after the sample trial production is completed, the project team shall submit an application, and the general manager shall organize members of relevant departments to review the work in the sample development stage. After the review is passed, the project team leader shall fill in the written documents of “group feasibility commitment” and “management support” and submit them to the manager for further support, and the design and development shall enter the next stage. If the original plan cannot be carried out, the work plan should be adjusted according to the situation.
4.5.3 process design and development:
4.5.3.1 process design input and review
The technical department is responsible for collecting the input data of this process and organizing relevant personnel to review and keep records of the input according to the requirements of the product/process quality checklist.
4.5.3.2 process design output and review
4.5.3.3 process design changes
The technical department shall change the design documents according to the “technical document management measures”.
4.5.3.4 management support: after the goal of the process design and development stage is completed, the project team shall submit an application, and the general manager shall organize members of relevant departments to review the process design and development stage. After the review is passed, the project team leader shall fill in the written documents of “group feasibility commitment” and “management support” and submit them to the manager for further support, and the design and development shall enter the next stage. If the original plan cannot be carried out, the work plan should be adjusted according to the situation.
4.5.4 process validation and verification
4.5.4.1 prepare and issue pilot production plan: the production department is responsible for preparing production plan.
4.5.4.2 job preparation verification: the production workshop shall conduct job preparation verification according to the product production control procedure.
4.5.4.3 pilot production: the production workshop shall organize production according to the pilot production plan. The technical department shall cooperate with the workshop to confirm the process according to the product production control procedure; The quality controller monitors and measures the products according to the control plan. The production department shall provide corresponding records to the technical department; Technical department, production workshop to verify the process.
4.5.4.4 measurement system analysis: the quality control department carries out dual analysis of measuring tools according to the measurement system analysis plan, evaluates, records and forms “measurement system analysis report”.
4.5.4.5 initial process capability study: the workshop shall carry out the initial process capability study according to the initial process capability study plan, and prepare the “initial capacity analysis report”. In case of insufficient capacity, corrective measures shall be proposed.
4.5.4.6 package evaluation: the technical department shall evaluate the package specification and package, and provide the results to the project team.
4.5.4.7 supplier PPAP:
4.5.4.8 process confirmation
— customer PPAP approval;
— customer confirmation of product drawing (countersign or sign similar confirmation opinions);
— customer replacement production drawing;
— other written documents of the customer;
— the customer orders again according to the original drawing (the order contract shall prevail).
4.5.4.9 mass production control plan: after PPAP is passed, project team members shall improve on the basis of pilot production control plan and prepare mass production control plan to meet the control requirements of mass production. The project team leader organizes members of relevant departments to review.
4.5.4.10 preparation list: the technical department is responsible for the preparation of material purchase list and tooling summary table; For similar products, if the commonality of the products has been reviewed, the same list can be applied to the implementation process of similar products.
4.5.4.11 after the trial production, the project team shall submit the application for development review, and the technical department shall organize members of relevant departments to review the design and development process and fill in the record form of design and development review.
4.5.4.12 quality planning, confirmation and summary: APQP shall be confirmed and summarized before the delivery of the first batch of mass production products. Including review:
— whether the control plan is timely updated and fully configured;
— whether the process instructions are advanced, detailed, operable and immediately available;
— whether the measuring tools and test equipment are analyzed for duality, accurate and reliable;
— whether all control plans and process flow charts are followed;
— whether APQP has always received the attention and support of the company’s management and conducted a management review.
4.6 engineering change
4.6.1 internal changes
4.6.1.1 in case of parts stopping production, delivery time, price or other factors requiring replacement materials, the purchasing department shall apply to the technical department for change.
4.6.1.2 if the quality control department finds any quality variation during the inspection, and the process capability analysis confirms that the production conditions must be changed, the change application shall be submitted.
4.6.1.3 when the manufacturing conditions must be changed by introducing new equipment or new processing technology, the production department or relevant departments shall apply for the change.
4.6.1.4 in the process of production, the production department shall apply for change if there are operational improvement Suggestions.
4.6.1.5 in the process of production, inspection and sales of products by other departments, if unreasonable or improvable product design is found, each unit can fill in the “engineering change application form” to apply for change to the engineering department.
4.6.2 customer changes
When the customer requests to change, the sales department shall provide the customer change data and engineering change application form to the technical department to evaluate the feasibility of the change, and the production department shall count the inventory quantity. If the client has a specified format, use a standard format file.
4.6.3 engineering change review
4.6.3.1 external engineering change application, the technical department shall organize relevant departments or multi-functional groups to discuss the feasibility of the change. If it is not feasible, the reasons for the infeasibility shall be recorded and faxed to the customer by the sales department for reassessment.
The technical department shall work with the customer to review patented designs that affect changes in form, fit and function (including performance, and/or durability) to properly evaluate all impacts.
4.6.3.2 internal engineering change application form, after receiving the engineering change application form, the technical department supervisor shall review the product quality, environmental protection, cost, production efficiency and other factors according to the change content. If it is confirmed that it is not feasible, it shall explain the specific reasons for returning it to the application unit for processing. If no consensus is reached, the management shall rule.
The sales department is responsible for notifying and obtaining the consent of customers of any changes affecting the implementation of the products required by customers.
For proprietary designs, impacts on form, fit, function (including performance and/or durability) shall be reviewed with the customer so that all impacts are properly assessed.
4.6.3.3 the engineering change review shall be completed within 2 working weeks, if required by the customer, within the time specified by the customer.
4.6.4 formulate the change plan
After the above change requirements are verified to be feasible, the technical department supervisor shall appoint engineers to organize a multi-functional team to take comprehensive consideration of product quality, environmental protection, cost, efficiency and other factors, and formulate a change plan, which shall be consistent with customer requirements. And record in engineering change request form.
4.6.5 engineering change approval
The engineer will complete the engineering change application form for the change scheme and submit it to the head of the technical department for approval. The technical department will submit the approved engineering change application form and the change data to the business department for the customer’s approval of the change scheme.
4.6.6 implementation of engineering change
After the approval of the engineering change application form, the engineer shall fill in the engineering change notice, distribute it to the production department, technical department and other relevant units, and urge all units to implement the change according to the content requirements of the engineering change notice. The technical department is responsible for tracking the implementation of engineering changes.
4.6.7 engineering change validation
4.6.7.1 the engineer shall arrange the sample production and trial production according to the sample production requirements of this procedure, and submit the qualified samples and relevant materials to the sales department for the customer’s confirmation after the qualified samples are tested.
4.6.7.2 the product size and safety performance test after the change shall be conducted by the laboratory of the quality control department of the company or by an external laboratory entrusted by the company.
4.6.7.3 for material/component changes, the supplier or the company’s outsourced laboratory shall test and provide the corresponding test report. The test report shall be approved by the head of technical department.
4.6.7.4 the technical department is responsible for ensuring that additional verification/identification requirements, such as those for npi, are met when requested by customers.
4.6.8 summary of engineering change
After the completion of engineering changes, if the customer drawings, product specifications and functionality are affected, the technical department shall modify the corresponding control plan, FMEA, inspection specifications and other documents, and the sales department or technical department shall submit them to the customer for approval according to the PPAP procedures, and track the approval results.
4.6.9 file preservation
Change documents related to automobile products shall be retained until the product is discontinued and the after-sales service period is 1 year.
Product production control procedure
Product production control procedure
1.Purpose
Control the manufacturing process to ensure process capability and manufacturing quality.
2.Scope
Applicable to the company’s auto parts production process control.
The production department is responsible for this process management.
4.0 process input: order/delivery plan; Inventory; Product specification/work instruction.
4.1 production plan
4.1.1 receive orders
After signing the contract, the sales department issues the production order to the production department, and the production department signs it.
4.1.2 status survey (inventory, order demand, production capacity, wip)
Production department according to the production orders issued by the sales department, inventory statistics, production capacity analysis.
4.1.3 decompose the production plan
Production department according to master the relevant information (safety inventory, production capacity, order demand, wip) according to the relevant requirements of order demand, and consider the priority of each order, do the monthly order decomposition, using the production schedule, regular weekly or daily production plan to the relevant workshop.
4.1.4 production realization
4.1.4.1 under normal circumstances:
Workshop production plans issued from the production department, in order to further review, have the ability to produce according to the sales department and production department of production plan and instructions, decomposition to the team and individuals, and completes the process of design, material of the declaration, tooling equipment, acquisition and related preparatory work, at the same time to organize the process production scheduling work.
If the workshop is unable to produce or the production plan has relevant problems, the head of the workshop shall report to the production department and sales department, and the production department shall make a clear reply and adjustment within one day.
4.1.4.2 in case of abnormality:
In the process of production operation or the current month, the production department shall check and track the production schedule of the production plan, communicate and coordinate the problems encountered, and make mandatory requirements when necessary.
During the production operation or at the end of each month, the production department will make summary analysis and report according to the completion of the production plan of each workshop, that is, the completion rate of the plan and the failure rate of the working procedure, and make rewards and penalties evaluation through the production management system.
The workshop shall make a comprehensive analysis of the monthly production plan, make a rectification plan if it is unable to complete the task according to the relevant plan indicators, and report to the production department in time.
After receiving the workshop’s rectification plan, the production department shall review the rectification plan according to the relevant requirements, and feed back the implementation of the relevant instructions to the workshop.
4.2 production process management
4.2.1 production preparation
4.2.1.1 the production department shall implement cleaning site and stationary site.The regulations on the cleaning of the factory and the location of tools and articles on site shall be implemented in accordance with the 5S related specifications.
4.2.1.2 the production department shall prepare materials, and external procurement or outsourcing shall be carried out according to relevant procedures.
4.2.1.3 the production operation plan shall be arranged according to the requirements of customers, according to the principle of priority and priority, which is conducive to quality control, and conducive to logistics.
4.2.1.4 the production department shall be responsible for the training of operators, and the training of operators in key processes shall be strengthened according to the human resource control procedures.
4.2.1.5 the equipment management personnel of the production department shall be responsible for checking the production equipment and molds, carrying out regular maintenance, and carrying out pre-maintenance, which shall be carried out in accordance with the equipment and tooling control procedures.
4.2.2 job preparation verification
4.2.2.1 timing of verification: during the initial production, material replacement and operation change.
4.2.2.2 the production department is responsible for the verification of facilities and environmental preparation conditions, including equipment, tooling, measurement system, operation documents, material preparation, etc.
4.2.2.3 the production department is responsible for verifying process status to ensure process capability. Generally, the first piece inspection is adopted.
4.2.2.4 if the quality is not stable, the production department shall continue to adjust the machine tools and tooling.
4.2.2.5 normal production can only be started after the first piece of inspection is qualified.When the material is changed, the operation is changed, and the production is resumed after a long period of discontinued production, it should be verified in time.
4.2.3 normal production
Under normal circumstances:
4.2.4 in case of abnormality:
4.2.5 inspection and coordination
In the process of production operation or the current month, the production department shall check and track the production schedule of the production plan, communicate and coordinate the problems encountered, and make mandatory requirements when necessary.
4.2.6 production inspection
Product in the production process, on-site quality control personnel to carry out inspection, in accordance with the “product monitoring and control procedures” implementation.
4.2.7 identification management and protection
According to the labeling management “product packaging, labeling provisions” control implementation.
4.2.8 production records
4.2.8.1 control the production process and fill in corresponding records according to the product control plan.
4.2.8.2 after the end of the production on the day, the team leaders shall fill in various production statistical statements, submit them to the production supervisor of the unit for summary, and make a daily report to the production supervisor of the workshop of the production department
4.2.9 final inspection
In the process of production or after the completion of product processing, the inspection shall be carried out according to the requirements of drawings and process control, and the specific implementation shall be in accordance with the product monitoring and control procedures.
4.2.10 handling warehousing
4.2.10.1 after the product is processed, relevant warehousing procedures, such as warehousing receipt and inspection report form, shall be handled after passing the inspection.
4.2.10.2 product storage and handling in the production process shall be carried out in accordance with the product protection control procedures.
4.2.11 delivery
The sales department will implement the delivery according to the arrangement of customers, and follow up the situation of the product delivery. Implement delivery control procedures.
4.2.11 statistics
4.2.11.1 the production department shall make statistics on the planned completion status (completion rate) of the corresponding production units.
4.2.11.2 the quality control department shall make statistics on the defective rate of process.
4.2.12 production evaluation and improvement
During the production operation or at the end of each month, the production department will make a summary analysis and report according to the completion of the production plan of each workshop, that is, the completion rate of the plan and the defective rate of the process, and the responsible unit will analyze the causes, compile and implement the rectification plan, and implement the improvement control procedure.
5.Relevant documents/records
Product monitoring and control procedures
1.0 purpose
Inspect and test raw materials, purchased parts, semi-finished products and finished products to prevent unqualified raw materials, purchased parts from unexpected use, unqualified semi-finished products from being transferred and unqualified finished products from leaving the factory.
2.0 scope of application
Applicable to the company’s raw materials, purchased parts, semi-finished products, finished products inspection and test control.
3.0 responsibilities
3.1 the quality control department is responsible for the inspection and test of raw materials, purchased parts, semi-finished products and finished products.
3.2 the production workshop is responsible for the implementation of process inspection.
3.3 the laboratory of quality control department is responsible for testing the specified project.
3.4 the technical department is responsible for formulating and issuing inspection procedures and relevant standards for raw materials, purchased parts, semi-finished products and finished products.
4.0 working procedure
4.1 preparation before inspection and test
4.4.1 by qc department according to the control plan, process documents, inspection instruction, before starting the inspection, review is a crucial test of each way and the method to make provisions of the project, its contents include: inspection method, inspection tools and precision, sampling method, assessment method, recording method, indicate that may need to provide the quality records, test and verification records.
4.1.2 when preparing sampling plan for data reception of counting characteristics, the acceptance criterion must be C=0 sampling plan.
4.1.3 inspection method
Sampling inspection: inspectors shall conduct sampling inspection of raw and auxiliary materials, purchased parts, semi-finished products and finished products.
Full inspection: the inspection of semi-finished products in the process by workshops and inspectors.
Self inspection: inspection performed by the operator himself.
“Three inspection system” : first inspection, patrol inspection, final inspection.
4.2 incoming inspection and test
4.2.1 after the arrival of raw materials and purchased parts, the warehouse keeper shall fill in the “material entry and delivery inspection form” and send it together with the quality certificate documents to the external inspection room under the quality control department.
4.2.2 after receiving the “inspection sheet for materials entering the warehouse”, the external inspection room shall carry out inspection, test or verification in accordance with the “verification and inspection rules for purchased (co-purchased) parts”/drawings;If the warehouse keeper cannot provide the supplier’s “quality certificate” at the same time, the external inspection room has the right to reject the inspection.
4.2.3 the inspector of the external inspection room shall fill in the inspection and test results on the “materials warehousing delivery and inspection sheet” respectively, one copy shall be fed back to the purchasing department, and the other copy shall be kept by himself. If qualified, the materials shall be warehoused, and if unqualified, relevant provisions of the control procedures for nonconforming products shall be followed.
4.2.4 inspectors shall record the inspection results and transfer them to the quality control department for approval. In addition to timely monitoring the quality of incoming goods, it can also be used as the data of supplier evaluation.
4.3 process inspection and test
4.3.1 the technical department shall make control plans, inspection procedures and inspection process CARDS according to product drawings and other requirements.
4.3.2 process inspection and test shall be carried out by relevant personnel organized by the workshop according to the requirements of process documents, and the quality control department shall be responsible for verifying and monitoring the effectiveness of process inspection and test. Evaluate the process capability of important or special processes as needed.
4.3.3 operator self-inspection
Operators shall conduct self-inspection in accordance with the requirements of the control plan/process document and mutual inspection if necessary, or the team leader and full-time inspectors shall assist in inspection and approve the self-inspection results.
4.3.4 full-time inspectors in the workshop shall inspect and test process characteristic items according to the inspection procedures/control plan, and fill in the results in the “quality inspection record form”.
4.3.5 monitoring the effectiveness of process inspection
4.3.6 if unqualified products are found during the process inspection and test, the control procedures for unqualified products shall be followed.
4.4 final inspection and test
4.4.1 the final product inspection can only be carried out after all the specified assembly procedures, inspection or test procedures have been completed and the specified requirements have been met; Inspectors perform inspections in accordance with inspection procedures/control plans and fill in final product inspection records.
4.4.2 for qualified products, only after the inspector issues the “product qualification certificate” can they be put into storage.
4.5 delivery inspection
4.5.1 before shipment, the quality control department’s delivery inspector shall unpack and inspect each batch of products according to the inspection items in the “product delivery inspection report”, and sign/seal the invoice after passing the inspection. And fill in the “product delivery inspection report form”.
4.5.2 the delivery inspector shall deliver all quality certificates to the warehouse keeper, who shall deliver them to the owner of the carrier to deliver to the customer.
4.5.3 upon customer’s request, chemical analysis supporting data of materials and test report of products shall be provided.
4.6 full size inspection and functional test
Annual full-size inspection and functional test shall be carried out by the quality control department in accordance with the specified requirements and according to the frequency specified by the customer (if the customer has no requirements, the annual production of 40,000 sets of products shall be conducted once a year), and the test report shall be reviewed when the customer requires.
4.7 all inspection and testing and reporting shall be completed within the specified time.
4.8 all inspectors must hold certificates.
4.9 emergency release
4.9.1 for the production raw materials and purchased parts that are in urgent need of production but have no time for inspection and test, the purchasing department shall fill in the “emergency release application form” and report to the technical deputy general manager/chief engineer for approval; Pass the approved emergency release form to production department and quality control department. Related warehouse to release the specified products, quality control department/production department to supervise the production process; Production workshop must hang “emergency release” and other forms of signs production, and maintain the sign; If the inspection and test results are qualified, the quality control department/production department shall delist and release the products and notify relevant units. In case of non-conformance, it shall be recovered and replaced immediately.
4.9.2 for homemade products production needs, in the process of inspection and testing completed or necessary reports received and verified, can’t transfer product order or release, need emergency release, by the production department to fill in the emergency release apps, approved by the deputy general manager/chief engineer, workshop or warehouse do identification and record, in order to recover when the result is unqualified.
5.0 related documents/records
5.1 sampling inspection scheme and acceptance criteria
5.2 product quality inspection records
5.3 materials entering the warehouse and sending inspection sheet
5.4 inspection records of purchased parts
Nonconforming product control procedure
1.0 purpose
Prevent unexpected use of nonconforming products.
2.0 scope of application
It is applicable to the control and treatment of raw materials, purchased parts, semi-finished products and finished products which are judged unqualified after inspection and test.
3.0 responsibilities
3.1 the quality control department shall be responsible for organizing the review of nonconforming products, the verification of nonconforming products after treatment and the statistics of nonconforming products.
3.2 the technical department is responsible for the formulation of rework and repair processes for defective products.
3.3 the process inspector is responsible for the determination, information transmission and identification of process nonconforming products, and the production workshop is responsible for the isolation of process nonconforming products and the disposal results of nonconforming products.
3.4 the production department shall be responsible for coordinating and organizing the disposal of nonconforming products, the review of nonconforming products in the self-inspection workshop, the verification after treatment and the statistics of nonconforming information.
3.5 the purchasing department and the production department are jointly responsible for the physical management of non-conforming products.
4.0 working procedure
4.1 control of production raw materials, main auxiliary materials and defective purchased parts:
4.1.1 the quality control department is responsible for inspection in accordance with the inspection regulations to determine whether the products are qualified or not.
4.1.2 when unqualified products are found:
4.2 control of nonconforming products in the production process
2 shop operator self-inspection, it found that when the product is unqualified, should immediately stop production, timely report to the workshop manager/inspector, and completed by the inspector “nonconforming trial list” section, submitted to the reviewers with permissions for trial and execution trial results, to compromise, release, according to article 4.8.
4.2.2 quality management department inspector in accordance with the control plan, process documents and inspection procedures for first article inspection and checking, it found that the product is unqualified, it shall immediately stop the production, and fill in the “process quality information feedback sheet” or “nonconforming to form”, submitted to the trial, the persons with the review authority workshop execution trial results, to compromise, release, according to article 4.8.
4.3 workshop/inspectors found on the process sequence of the product is unqualified, immediate notice must be given to stop production, and timely notify the process manager/inspector to confirm, for the processing and assembly of products in isolation, fill out the “nonconforming product trial form”, submitted to the trial, the persons with review permissions and execute the trial results, to compromise, release, according to article 4.8.
4.4 control of returned products
4.4.1 the warehouse shall fill in the relevant columns of “goods returned for examination”, and then transfer them to the quality control department for verification after filling in the reasons for return to the sales department. If necessary, the quality control department shall carry out inspection or test one by one, and submit the verified results to the technical department for examination, while the production department shall carry out the examination results.
4.5 review authority of nonconforming products:
4.6 the technical department shall be responsible for preparing specific rework/repair work instructions.
4.7 disposition results of nonconforming products fall into four categories:
4.7.1 rework.
4.7.2 repair.
4.7.3 concession acceptance (applicable to non-matching size, non-contact surface and general characteristics that do not affect customers’ use).
4.7.4 scrapped or rejected.
4.8 concession and release
4.8.1 concessions of purchased products shall be submitted to the technical deputy general manager/chief engineer for approval by the procurement department in the form of “purchase products concession acceptance approval form”. If the product needs to be selected for use, the purchasing department shall coordinate and arrange it, and the selected product shall be re-inspected.
4.8.2 wip concession shall be handled by the corresponding workshop according to the review conclusion.
4.8.3 any concession affecting product quality shall be agreed by the sales department with the user or customer representative, and corresponding records shall be kept.
4.9 management description
4.9.1 reworked and repaired products shall be re-inspected according to relevant inspection procedures.
4.9.2 the quality control department shall, based on the inspection records and other data, make statistics and analysis of the rate of nonconforming products, identify the main causes of nonconforming products, formulate the priority reduction plan, and fill in the “corrective and preventive measures processing sheet” to track the progress of the plan.
4.9.3 in the production and assembly site, it shall be easy to get the rework/repair work instructions for unqualified products.
4.9.4 all suspicious materials and products shall be treated as nonconforming products.
4.9.5 in the production site, visual limit samples and isolation areas of nonconforming products or suspicious materials or products shall be established for visual identification, which can be divided into qualified products/nonconforming products. Visual limit samples shall be assessed by the technical department.
4.9.6 in case of non-conforming products being shipped, the quality control department shall immediately notify the sales department or relevant customer departments.
4.9.7 if the product or manufacturing process has been approved by the customer in accordance with the provisions, the approval (including outsourcing products and all rework parts) shall be applied to the customer in a timely manner when the product or manufacturing process is different from the approved product/process specification. After being approved by the customer, the labels designated by the customer shall be made outside the packing boxes and the product quality traceability records shall be made. When the time limit approved by the customer is exceeded, the company must ensure that the product meets the original requirements or the customer’s revised specifications.
5.0 related documents/records
5.1 priority reduction plan for nonconforming products
5.2 review sheet of nonconforming products
6.0 product rework notice
6.1 product repair notice
6.2 product scrap list
6.3 concession of purchased products to receive approval form
6.4 process quality information feedback sheet